1.
Kapoor E, Kumar A, Singh D. Energy-Efficient Flexible Flow Shop Scheduling With Due Date and Total Flow Time. IJRITCC [Internet]. 2023Mar.2 [cited 2025Sep.11];11(2s):259-67. Available from: https://ijritcc.org/index.php/ijritcc/article/view/6145